Asana and Pivotal Tracker automations
Pivotal Tracker holds the stories and Asana holds the tasks, so “New Story” becomes “Create Task or Subtask”.
Set up an automation: when new story in Pivotal Tracker, create task or subtask in Asana
Build itOr have an AI agent work across Asana and Pivotal Tracker: it decides what to do in each on every run, on a schedule or when you ask it in its chat.
Asana and Pivotal Tracker in practice
Used for
Pivotal Tracker holds the stories and Asana holds the tasks, so “New Story” becomes “Create Task or Subtask”.
Best template
“New Story” in Pivotal Tracker, then “Create Task or Subtask” in Asana. The action can set assignee, tags, dates and description, so each new story arrives as a filled-in task.
Watch out
“New Story” in Pivotal Tracker is polling, so tasks appear in Asana after a scheduled check.
Asana and Pivotal Tracker templates
Pick one and Captain builds it with you.


When new task created in selected project in Asana, create story in Pivotal Tracker
Build this

When new tag created in Asana, create story in Pivotal Tracker
Build this

When new story added to task or goal in Asana, create story in Pivotal Tracker
Build this

When new activity in Pivotal Tracker, create task or subtask in Asana
Build this

When new story in Pivotal Tracker, create task or subtask in Asana
Build this

When new project in Pivotal Tracker, create task or subtask in Asana
Build this
Asana and Pivotal Tracker triggers and actions
Every one of both apps. A trigger starts the work; actions are the steps.
Triggers
8- New task created in selected projectPolls the selected Asana project and fires once for each task created since the previous check, oldest first. Each item is one task (gid, name, completed, created_at, assignee, created_by, custom_fields, tags…
- New story added to task or goalPolls one Asana task or goal and fires once for each new story (a comment or system activity such as added to a project or completed) created since the last check. Reads up to 100 stories per page, oldest first, and…
- New task completedPolling trigger for one Asana project: on each check it fires once for every task in the project that was marked complete within the polling interval. Tasks that are only created or edited do not fire it. Returns gid…
- New tag createdFires for each new tag created in the selected Asana workspace, checking tags created since the last poll (oldest first, up to 100 per page). Each item has gid, name, color, created_at and workspace.
- When a new comment is added to a taskRuns when a new comment is added to a task. Each run returns the comments written within the polling interval, one item per comment; system activity such as assignments or status changes is ignored. Pick a project to…
- New project createdFires once for each new project created in the chosen Asana workspace since the last check. Returns each project's gid, name, notes, created_at, due_on, owner, members, team, current_status and workspace. Newest first…
- New task assignedPolls one project and returns each task that has an assignee and changed since the last check, newest first; later edits to an assigned task fire again.
- Updated task marked incompleteRuns when task is marked incomplete (reopened) in a chosen project.
No triggers match.
Actions
30- Get workspace detailsReturns one Asana workspace by its gid: name, is_organization and email_domains (all three by default, or only the ones selected). Output is {data: {gid, ...}, message}; if the workspace is not found, data is null and…
- Get all workspacesRetrieve Asana workspaces; choose fields to return, enable pretty output, or set a limit.
- Get projectRetrieve a project's details and choose which fields to return.
- Get project tasksRetrieve tasks from a selected project with optional filters and page-by-page results.
- Create projectCreate a new project in a workspace and set name, notes, start/due dates, owner, privacy, color, and default view.
- Delete projectDeletes a project using its project ID.
- Create task or subtaskCreates a task or subtask with custom fields, assignee, tags, dates, and description.
- Update taskUpdates an existing Asana task. Only the fields you fill in change; empty fields keep their current value. Assignee is set by email or 'none' to unassign; parent by task gid or 'none'. Fails if both due fields or both…
- Get usersFetch users in a workspace; select workspace, optional team, limit, offset, and response fields.
- Create sectionCreate a new section in an Asana project. Returns the created section as { data: { gid, name, resource_type, created_at, project } }. Optionally place it before or after an existing section (not both); without either…
- Get project sectionsLists a project's sections as {data, message}: gid, name, created_at and project by default. Fetches all pages unless Limit is set; empty list if none.
- Get task storiesReturns the stories of one Asana task: comments and system activity such as assignments, moves and due-date changes, oldest first unless Sort Ascending is false. Only the task id is sent to Asana; Workspace and Project…
- Update projectUpdates one Asana project by gid and returns it as { data: project }. Only filled fields change (at least one required); Start Date needs Due Date.
- Assign taskAssigns an existing Asana task to the user with the given email address, replacing any current assignee. The user is looked up by email and must be visible to the connected account; an invalid email or unknown user…
- Create project from templateCreates a new Asana project by copying a project template. Asana runs the copy as a background job: the response is { data: { gid, status, resource_type: "job", resource_subtype: "instantiate_project_template"…
- Attach external file to taskAttach an external file to a chosen Asana task by providing a URL and file name.
- Create task commentPost a text or sticker comment on a selected task; choose workspace, project, pin, or send HTML.
- Create task from templateCreates a new Asana task from a selected task template, optionally overriding the task name or adding it to a chosen project.
- Find sections in projectFind sections in a selected project and choose fields, limit, or offset.
- Duplicate taskCopy an existing task and optionally include assignee, attachments, dates, subtasks, tags, and other selected fields.
- Find projectGet a project by ID and return selected response fields (owner, workspace, members, etc.).
- List all projectsRetrieve projects from a chosen workspace; optionally return only selected fields, filter archived, and set limit/offset.
- Get task detailsGet a task or list of tasks
- Find task commentsRetrieve all comments (stories) for a specified task by task ID.
- Get all tagsRetrieve tags from a chosen workspace; set workspace, limit, offset, and returned fields.
- Get taskRetrieve a task by ID, selecting which fields to return and optional pretty formatting.
- Add tags to taskAdd one or more existing or new tags to a task; create tags in the workspace if needed.
- Get attachmentRetrieve an attachment by its GID and choose optional response fields.
- List attachmentsList attachments for a selected task, project, or project brief; set limit, offset, and fields.
- Create goalCreate a goal in a selected workspace and time period; set name, owner, team, dates, notes, and followers.
No actions match.
Triggers
3- New activityTriggers when any new activity happens within a project.
- New projectTrigger when a new Project is added.
- New storyTriggers when a new story is added in a project.
No triggers match.
Actions
3- Create projectCreates a new project.
- Find projectFinds an existing project by exact name match. Optionally, create a project if none are found.
- Create storyCreates a new story in a project
No actions match.
Questions about Asana and Pivotal Tracker
What can start a Asana and Pivotal Tracker automation?
“New task created in selected project”, “New tag created”, “New story added to task or goal”, “New activity” and “New story”, and the others in the templates above.
Which other apps work with both Asana and Pivotal Tracker?
Google Sheets, Slack, Userback and Harvest. Each one has templates with Asana and with Pivotal Tracker, so a third app can join the same job.
All Asana integrations · All Pivotal Tracker integrations · Every app, A to Z
Connect Asana and Pivotal Tracker
Or pick another template above. Free to start.
Build it with Captain