Asana and Vistaly automations

Asana is where work gets discussed, and Vistaly collects feedback when a task comment runs “Create Feedback”.

Set up an automation: when a new comment is added to a task in Asana, create feedback in Vistaly

Build it

Or have an AI agent work across Asana and Vistaly: it decides what to do in each on every run, on a schedule or when you ask it in its chat.

Asana and Vistaly in practice

Used for

Asana is where work gets discussed, and Vistaly collects feedback when a task comment runs “Create Feedback”.

Best template

“When a new comment is added to a task” in Asana, then “Create Feedback” in Vistaly. Comments teammates leave on tasks become feedback entries in Vistaly without anyone copying them over.

Watch out

“When a new comment is added to a task” is polling, so feedback arrives after a scheduled check.

Asana and Vistaly templates

Pick one and Captain builds it with you.

  • When a new comment is added to a task in Asana, create feedback in Vistaly

    Build this
  • When new task created in selected project in Asana, create feedback in Vistaly

    Build this
  • When a new comment is added to a task in Asana, add card metric in Vistaly

    Build this
  • When new task created in selected project in Asana, add card metric in Vistaly

    Build this

Asana and Vistaly triggers and actions

Every one of both apps. A trigger starts the work; actions are the steps.

Triggers

8
  • New task created in selected projectPolls the selected Asana project and fires once for each task created since the previous check, oldest first. Each item is one task (gid, name, completed, created_at, assignee, created_by, custom_fields, tags…
  • New story added to task or goalPolls one Asana task or goal and fires once for each new story (a comment or system activity such as added to a project or completed) created since the last check. Reads up to 100 stories per page, oldest first, and…
  • New task completedPolling trigger for one Asana project: on each check it fires once for every task in the project that was marked complete within the polling interval. Tasks that are only created or edited do not fire it. Returns gid…
  • New tag createdFires for each new tag created in the selected Asana workspace, checking tags created since the last poll (oldest first, up to 100 per page). Each item has gid, name, color, created_at and workspace.
  • When a new comment is added to a taskRuns when a new comment is added to a task. Each run returns the comments written within the polling interval, one item per comment; system activity such as assignments or status changes is ignored. Pick a project to…

Actions

30
  • Get workspace detailsReturns one Asana workspace by its gid: name, is_organization and email_domains (all three by default, or only the ones selected). Output is {data: {gid, ...}, message}; if the workspace is not found, data is null and…
  • Get all workspacesRetrieve Asana workspaces; choose fields to return, enable pretty output, or set a limit.
  • Get projectRetrieve a project's details and choose which fields to return.
  • Get project tasksRetrieve tasks from a selected project with optional filters and page-by-page results.
  • Create projectCreate a new project in a workspace and set name, notes, start/due dates, owner, privacy, color, and default view.

Questions about Asana and Vistaly

What can start a Asana and Vistaly automation?

“When a new comment is added to a task” and “New task created in selected project”.

Which other apps work with both Asana and Vistaly?

Systeme.io, Product hunt, Slack, CompanyCam and tawk.to. Each one has templates with Asana and with Vistaly, so a third app can join the same job.

All Asana integrations · All Vistaly integrations · Every app, A to Z

Connect Asana and Vistaly

Or pick another template above. Free to start.

Build it with Captain
Asana and VistalyBuild it